HDPE FABRICATION · WA SINCE 1999

Tough plastics. Tougher jobs.

Engineered HDPE that keeps air, water and people moving — safely. Designed, analysed and fabricated for the industry.

§01

Air. Water. People.

Three product pillars built for a single environment — the working mine.

Row of large-diameter HDPE Polyduct sections strapped on a flatbed at sunrise
Air

Mine ventilation ducting

Rigid and segmented HDPE ducting for positive and negative pressures. Straights, Elbows, Y-pieces, branches and adapters — custom sizes and custom shapes.

See the Air range
HDPE Donut pump float being lifted on site for a 110 kW pump
Water

Dewatering systems

Pump floats, modular pontoons and floating intake screens. Sized for your application. Transport-friendly. Built to last.

See the Water range
HDPE escapeway sections ready for underground install
People

Flat Pack Escapeways

Life-of-mine HDPE escape way system. Hundreds of meters per shipping container, complete supply package.

See the People range
§02

Design. Analyse. Fabricate.

More than fabrication — we engineer the solution.

01

Design

3D concepts, layouts and visualisations. R&D on project-specific innovations.

02

Analyse

FEA analysis. Computational Fluid Dynamics where airflow or intake behaviour matters.

03

Fabricate

CNC routing (4100 × 2055 mm bed), fusion butt-welding and DVS 2207-4 extrusion welding — all under supervision.

§03

Shipped. On-site. Working.

Large HDPE pump float deployed in dewatering pondCase · 01 · Dewatering

Large-scale 3,200 × 3,030 mm pump float for a 3-tonne 110 kW pump

  • 3,200 × 3,030 mm custom HDPE donut float
  • 4-point one-over-two lift rig — FEA-verified
  • Sub-2.7 m transport width — no permits, no escort
  • Zero coating maintenance over pump life
  • 6-week build, dispatched from Jandakot
HDPE ducting loaded on flatbed for site dispatchCase · 02 · Ventilation

Modular HDPE ventilation ducting — workshop to site

  • Stacked modular PolyDuct, flanged end-treatments
  • Factory butt-welded to DVS 2207-4
  • Sub-2.7 m transport width — load-out ready
  • ~14% fan-power reduction vs fabricated-flat duct
  • 6-week lead time, dispatched from Jandakot
Fabricated HDPE ducting row on the workshop floorCase · 03 · Marine

HDPE marine intake fittings — fabricated run

  • Corrosion-free HDPE — zero coatings, zero paint
  • Self-buoyant, self-levelling intake assemblies
  • Workshop-fabricated fittings, factory butt-welded
  • Follows water level — no dry-dock cycle
  • 10+ year projected life in salt water
§04

Our experience

Projects that prove it.

Ventilation, dewatering and egress work for mines across Western Australia and beyond.

View all projects

Did you know

A single 110 kW mine fan costs around $400,000 a year to run. Reducing friction, leakage and recirculation directly impacts cost.

◆ Resource · PDF · 28 pages · 3.4 MB

The 2026 Polyline Capability Statement.

Our full product range, fabrication capacity and the engineering we back it with — packaged as a single PDF for procurement.

Have drawings? We'll quote fast.

Tell us your project — pump specs, duct diameters, site access. Our engineering team will review and respond fast.