MINING · Pilbara, WA

Pump-float install — Pilbara red earth

On-site pump float commissioning across Pilbara red earth — modular HDPE delivered, lifted and installed within road-transport limits.

From the build.

HDPE pump-float install on Pilbara red earth

What went on the truck.

Brief us a similar project.

Send the spec — we'll scope, quote and dispatch from Jandakot.