MINING
Modular stacked Polyduct — flanged end-treatments, factory butt-welded
Client · Underground Metalliferous Mine
Problem: a free air-rise required stacked modular ducting with demanding alignment. Fan leakage was burning power on the primary drive.
Solution: modular stacked Polyduct cylinders, flanged end-treatments, factory butt-welded to DVS 2207-4. Inherently round MDPE moulded sections — not fabricated flat — and double-ringed end joints sized for the existing fan flange.
- Seamless inherently-round cylinders — fewer leak paths than fabricated-flat alternatives
- Double-ring ends and flanged transitions to suit existing fan case ID
- UV-stable for outdoor staging at the portal before install
- 6-week lead time, dispatched from Jandakot
Gallery
From the build.


Products used
What went on the truck.
Polyduct — Segmented Ducting
View productBrief us a similar project.
Send the spec — we'll scope, quote and dispatch from Jandakot.