MINING · Kalgoorlie, WA
3,200 × 3,030 mm donut float — 3 t, 110 kW pump
Client · Tier-1 Gold Mine
Problem: Submersible pump needed relocation across rising pit water. Steel float options exceeded the crane envelope.
Solution: Donut-style HDPE pump float, 4-point one-over-two lift, perforated basket, mud-clearance foot. FEA-verified rigging, full compliance documentation, transport within road limits.
- Install time cut 62%
- Zero coating maintenance
- Sub-2.7 m transport width
- 6-week build, dispatched from Jandakot