MINING · Kalgoorlie, WA

Large-format donut pump float — 110 kW pump, sub-2.7 m transport

Client · Tier-1 Gold Mine

Problem: a submersible pump needed relocation across rising pit water. Steel float options exceeded the crane envelope and the road-transport width.

Solution: Donut-style HDPE pump float with 4-point one-over-two lift, perforated basket and mud-clearance foot. FEA-verified rigging, full compliance documentation, transport within road limits.

  • Sub-2.7 m transport width — no oversized permits or escort
  • Zero coating maintenance — HDPE will not rust, corrode or suffer electrolysis
  • 4-point one-over-two rigging — FEA-verified before fabrication
  • 6-week build, dispatched from Jandakot

From the build.

HDPE Donut pump float being lifted on site for a 110 kW pump
Large HDPE pump float deployed in dewatering pond

What went on the truck.

Brief us a similar project.

Send the spec — we'll scope, quote and dispatch from Jandakot.