Problem: Submersible pump needed relocation across rising pit water. Steel float options exceeded the crane envelope.

Solution: Donut-style HDPE pump float, 4-point one-over-two lift, perforated basket, mud-clearance foot. FEA-verified rigging, full compliance documentation, transport within road limits.

  • Install time cut 62%
  • Zero coating maintenance
  • Sub-2.7 m transport width
  • 6-week build, dispatched from Jandakot