MINING · Kalgoorlie, WA
Large-format donut pump float — 110 kW pump, sub-2.7 m transport
Client · Tier-1 Gold Mine
Problem: a submersible pump needed relocation across rising pit water. Steel float options exceeded the crane envelope and the road-transport width.
Solution: Donut-style HDPE pump float with 4-point one-over-two lift, perforated basket and mud-clearance foot. FEA-verified rigging, full compliance documentation, transport within road limits.
- Sub-2.7 m transport width — no oversized permits or escort
- Zero coating maintenance — HDPE will not rust, corrode or suffer electrolysis
- 4-point one-over-two rigging — FEA-verified before fabrication
- 6-week build, dispatched from Jandakot